Projects with FORD HSAP
Downtime Reduction, Quality Improvements and Material Savings
-
Deployed team of IIE die makers to HSAP to assist Ford team since 2006.
-
Reduced tool & die related downtime on all lines by up to 79%
-
Improved panel quality and reduced tool & die related metal finish by 80%
-
Reduced tool & die related scrap rate by 95%
-
Improved metal savings performance (MUD) by 30% to 50%
-
Currently working with HSAP team on scalloped blank initiatives
Cost Save Project ($1.3 M)
-
Scanned existing MY2006 Fusion / Lincoln body side
-
Scanned MY2008 cap-less fuel filler insert
-
Eliminated fuel filler ring
-
Successfully Incorporated fuel filler ECN on Fusion / Lincoln body-side running at Ford / Magna Hermosillo
-
Updated 2D files to 3D solid die designs
-
Manufactured all necessary components
-
Performed install and tryout under aggressive Ford / Magna production schedules